
Under Construction
Dutchess Manor / Visitor Center
The future Visitor Center becomes the corridor's central orientation point - trip planning, restrooms, exhibits and a home base for education programs. Site work is underway now, with completion targeted alongside the Breakneck Connector.
- 0.9 mi
- Distance
- Not yet open
- Estimated time

- 20 ft
- Elevation gain
Difficulty: Easy
Surface: Paved (planned)
Wheelchair access: Yes
Stroller-friendly: Yes
Amenities
Visitor Center (planned)
Restrooms (planned)
Parking (planned)
Getting Here
- Metro-North Hudson Line - Beacon station (1.8 mi)
- Parking: New lot planned; not yet available.
Connects To
- Breakneck Connector
- Fjord Trail North
Scan at the Trailhead
Future trailhead signage will carry this QR code, opening directly into this page - part of the proposed physical-to-digital wayfinding system.
