
Under Construction
Fjord Trail North
Fjord Trail North threads through second-growth forest along the Hudson shoreline, connecting the future Visitor Center to Long Dock Park in Beacon. Site and environmental review are complete and construction began in early 2026.
Fjord Trail North: active construction zone
Heavy equipment is on site between the Visitor Center location and Long Dock Park. The area is not open to visitors.
Last updated: Yesterday, 4:40 PM
- 1.9 mi
- Distance
- Not yet open
- Estimated time

- 110 ft
- Elevation gain
Difficulty: Moderate
Surface: Natural surface with boardwalk sections (planned)
Wheelchair access: Yes
Stroller-friendly: Not recommended
Amenities
Wildlife viewing (planned)
Getting Here
- Metro-North Hudson Line - Beacon station (0.6 mi)
- Parking: Use Long Dock Park lot until trail-specific parking opens.
Connects To
- Dutchess Manor / Visitor Center
- Long Dock / Beacon
Scan at the Trailhead
Future trailhead signage will carry this QR code, opening directly into this page - part of the proposed physical-to-digital wayfinding system.
