Hudson Highlands Fjord Trail
Forested shoreline north of the Highlands, near the Fjord Trail North corridor
Under Construction

Fjord Trail North

Fjord Trail North threads through second-growth forest along the Hudson shoreline, connecting the future Visitor Center to Long Dock Park in Beacon. Site and environmental review are complete and construction began in early 2026.

Fjord Trail North: active construction zone

Heavy equipment is on site between the Visitor Center location and Long Dock Park. The area is not open to visitors.

Last updated: Yesterday, 4:40 PM

1.9 mi
Distance
Not yet open
Estimated time
110 ft
Elevation gain

Difficulty: Moderate

Surface: Natural surface with boardwalk sections (planned)

Wheelchair access: Yes

Stroller-friendly: Not recommended

Amenities

  • Wildlife viewing (planned)

Getting Here

  • Metro-North Hudson Line - Beacon station (0.6 mi)
  • Parking: Use Long Dock Park lot until trail-specific parking opens.

Connects To

  • Dutchess Manor / Visitor Center
  • Long Dock / Beacon
Scan at the Trailhead

Future trailhead signage will carry this QR code, opening directly into this page - part of the proposed physical-to-digital wayfinding system.